Themisby Keghida & Associates

509 Cathedral Parkway, Morningside Heights, Manhattan, NY 10025

A 12-story elevator apartment building built in 1909 with 94 residential units.

Not an official City of New York service. Public records, which can be incomplete or wrong. Information, not legal advice.

The full report is loading…

At a glance

Open HPD violations on this tax lot
58 — Class C (immediately hazardous): 6 · Class B (hazardous): 37 · Class A (non-hazardous): 15
Open DOB violations on this tax lot
5
Year built
1909
Floors
12
Lot area
10,800 sq ft

From New York City's public records: City Planning's PLUTO file and HPD's and DOB's violation records, checked November 14, 2026. HPD and DOB violations are counted for the whole tax lot; the total at the top of the report also counts ECB violations. Neighborhood from NYC Planning’s GeoSearch.

The record in brief

The city’s housing department (HPD) lists 58 open violations at 509 Cathedral Parkway: 6 immediately hazardous, 37 hazardous and 15 not hazardous. It has written up 738 violations here in all since 2004. 9 of the open ones are more than 5 years old, including 3 of the immediately hazardous; violations that old were usually fixed and never closed out on paper.

The open violations are mostly about leaks and mold (27), paint and plaster (15) and paperwork the landlord owes the city (2).

The newest was written up on October 8, 2026; the oldest still open on February 8, 2009.

The city’s Buildings Department lists 5 open violations on the lot.

In the past 12 months, people made 44 requests to 311 for this property, mostly about repairs and upkeep (19), leaks and plumbing (9) and noise (7). A 311 request is a complaint, not a finding.

Newest open housing violations

From New York City’s public records (HPD violations, Buildings Department violations, 311), checked November 14, 2026.

Complaints to the housing department

In the past 12 months, tenants made 13 complaints to the city’s housing department (HPD) about 509 Cathedral Parkway, 2 of them about the whole building.

Most often they were about heat and hot water (6), paint and plaster (4) and pests, garbage and other unsanitary conditions (4).

The newest was made on October 19, 2026.

A complaint is a tenant’s report; what an inspector finds is written up as a violation.

From the housing department’s complaint records (HPD), checked November 14, 2026. Counted for the whole tax lot, which can hold more than one building.

Questions about 509 Cathedral Parkway

Who owns 509 Cathedral Parkway?

The full report on this page shows the owner on record with the city’s Department of Finance, the deeds and mortgages filed with the City Register, and who the owner registered with the housing department to run the building.

Does 509 Cathedral Parkway have open violations?

Yes. The housing department (HPD) lists 58 open HPD violations on this tax lot, 6 of them immediately hazardous. The Buildings Department (DOB) lists 5 open DOB violations.

What do tenants complain about at 509 Cathedral Parkway?

In the past 12 months, most often heat and hot water, paint and plaster and pests, garbage and other unsanitary conditions, going by the 13 complaints made to the housing department.